It also helps if you first install a layer of roofing felt.
2 layers roll roofing.
Extend the front edge of the drip edge so it runs off the roof and into the.
Once the cement is spread across the roof it s time to place the second layer down.
Owens corning deckseal sa sbs cap 39 375 ft w x 32 833 ft l 100 sq ft shasta white roll roofing.
The top membrane sheet to a torch down roofing system is a smooth cap sheet.
When the two layers are pressed together they form a seal.
Valleys will be open so flash them before hand with metal or two layers of roll roofing the first an 18 inch wide strip and the second 36 inches wide.
If your roof pitch declines up to 1 inch vertically for every 12 inches horizontally 1 12 pitch it is a good candidate for rolled roofing as long as you use the concealed nail method of fastening.
Install the first strip upside down.
Asphalt shingles typically can have one more layer added over the top two roofs total.
Then nail the opposite edge.
So anywhere along the gable end that you can see the felt you ll see two layers.
The homeowner will have two layers of shingles protecting the roof and the home is less likely to have ice dams he says.
How to install roll roofing on low slope roofs.
On most flat roofs such as epdm tpo or modified it is perfectly acceptable to two layers of roofing.
Apply roofing cement and secure the second layer to the roof.
For extra durability you may install roll roofing in two layers.
Check the sheathing for any nails or screws that may be.
Get your trowel and another scoop of cement and apply it on the roof below the second chalk line.
The first course starts with an extra 1 2 wide run.
Assuming your roofing contractor is using standard 36 wide 15 roofing felt double coverage means that each layer of felt put down across the roof laps 19 over the upper half of the previous course.
Attach drip edge along the edge of the roof with roofing cement.
Steep sloped roof products such as tile slate metal and shakes only allow one layer.
Clean the roof with a broom to remove any debris.
As mentioned above place the first 6 inches 15 cm of the second layer on top of the first layer.
In a two layer torch down roof the system is complete at this point.
Nail along one edge first spacing nails inch in from the edge and 6 inches apart.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
As it is rolled out the roofing professional will use a torch to heat the bottom of the cap to the top of the base sheet.
For many years it was acceptable to put even the third layer.
Richards also estimates that the homeowner saves at least 1 000 in costs associated with removing and properly disposing of the existing shingles.